Lifetime membership is only 10$ instead of 99$
left until the end of the campaign.
(one time fee, no hidden charges.)

315 KVA station details

The treatment plant for 315 kva sub-station deployment. It is a fully editable dwg format file. Checked: 19.05.2025

Emergency electrical substation

ELECTRICAL SUBSTATION EMERGENCY PLAN. It is a fully editable dwg format file. Checked: 19.05.2025

The sewer project slope calculations

Sewer slope calculations and layout of the project. It is a fully editable dwg format file. Checked: 19.05.2025

Battery cooling

BATTERY COOLING. It is a fully editable dwg format file. Checked: 19.05.2025

Exam room and manhole cover

. It is a fully editable dwg format file. Checked: 19.05.2025

Waste water processing plant

SLUDGE TREATMENT PLANT. It is a fully editable dwg format file. Checked: 19.05.2025

The circuit diagram of the control room hydro-electric turbine generator

Electrical system protection control and hydropower francisthis single line is the model for the measurement of the turbine. It is a fully editable dwg format file. Checked: 19.05.2025

Cellular phone tower

. It is a fully editable dwg format file. Checked: 19.05.2025

The main Aqueduct

TOPOGRAPHICAL DETAILS OF TRANSMISSION DRIVEN PUMP. It is a fully editable dwg format file. Checked: 19.05.2025

Drinking water collection and distribution system monteagudo Bolivia

Primary drinking water distribution Monteagudo Bolivia Collectors Set. It is a fully editable dwg format file. Checked: 19.05.2025

Public sewer network

A constructive solution is presented to the company a water works for the benefit of 300 families. It is a fully editable dwg format file. Checked: 19.05.2025

Medium voltage transmission line going through the highway Chile

12 KV. It is a fully editable dwg format file. Checked: 19.05.2025

prev < . > next