Lifetime membership is only 10$ instead of 99$
left until the end of the campaign.
(one time fee, no hidden charges.)

Substation

A substation wiring and details. It is a fully editable dwg format file. Checked: 3.01.2026

Building filters

Building a stage filters. It is a fully editable dwg format file. Checked: 3.01.2026

3-Phase Electric Red construction

ELECTRICAL CONSTRUCTION MATERIALS AS WELL AS A RANGE OF DETAILS INCLUDING A LIST OF THE 3 STAGES OF THE STRUCTURE ACCORDING TO THE CFE NETWORK. It is a fully editable dwg format file. Checked: 3.01.2026

The plant waste water treatment plant

At the Plant City Wastewater Treatment Plant and the location of the architectural structure. It is a fully editable dwg format file. Checked: 3.01.2026

Cleaner treat

Mud cleaning system for the purification of waste water through separation OIF drag the circular rotation. It is a fully editable dwg format file. Checked: 3.01.2026

Stay Metal lamppost

3-dimensional drawing from 220kV substation metal pole supporting a metal ruler. It is a fully editable dwg format file. Checked: 3.01.2026

Landfill

Business storage full plant for Antamina Punto placement is made. It is a fully editable dwg format file. Checked: 3.01.2026

Channel

2 channel distribution. It is a fully editable dwg format file. Checked: 3.01.2026

Basic transformer

BENCH TYPE 3 MT IN THE RECORD-PHASE TRANSFORMER BASES. It is a fully editable dwg format file. Checked: 3.01.2026

Weather underground transmission

Weather underground transmission showing according to CFE bill. It is a fully editable dwg format file. Checked: 3.01.2026

Sewage - topic

The sewerage network and the Assuta - Bolivia. It is a fully editable dwg format file. Checked: 3.01.2026

Field operation

Oil treatment. It is a fully editable dwg format file. Checked: 3.01.2026

prev < . > next