Lifetime membership is only 10$ instead of 99$
left until the end of the campaign.
(one time fee, no hidden charges.)

Air conditioning installation

Installation of the split Condenser and external. It is a fully editable dwg format file. Checked: 2.01.2026

Pharmacy Laboratory - hydro project plumbing

Pharmacy lab hydro project - plants - sanitary details - sanitary. It is a fully editable dwg format file. Checked: 2.01.2026

Gas Installation

Residential buildings details of the gas installation. It is a fully editable dwg format file. Checked: 2.01.2026

Transverse sectionwith plumbing and heating

-Details - block - machine room - Pluvial complete pumping. It is a fully editable dwg format file. Checked: 2.01.2026

Lift details

Otis Elevator Mark - detail sections. It is a fully editable dwg format file. Checked: 2.01.2026

Hot and cold water

Hot and cold water installation Department. It is a fully editable dwg format file. Checked: 2.01.2026

Bell sucking Smoking

Absorption of the bell - section with the technical specifications is smoking a cigarette. It is a fully editable dwg format file. Checked: 2.01.2026

Bell smoke absorber

The partition that contains the technical specifications. It is a fully editable dwg format file. Checked: 2.01.2026

Scents suction Bell

-Part - separate the plant oil. It is a fully editable dwg format file. Checked: 2.01.2026

Reduce bomb

Reduce bomb constructive details-section. It is a fully editable dwg format file. Checked: 2.01.2026

Detail the hose against fires

Chapter - plant against fires hose. It is a fully editable dwg format file. Checked: 2.01.2026

Extintor

Detailed installation extintores - Technical Specifications section contains. It is a fully editable dwg format file. Checked: 2.01.2026

prev < . > next