Lifetime membership is only 10$ instead of 99$
left until the end of the campaign.
(one time fee, no hidden charges.)

The project sub-station 15kv

The project sub-station 15kv - details and parts list. It is a fully editable dwg format file. Checked: 19.05.2025

Project 33 sub-station 30kv

The project sub-station 30kv - track list details. It is a fully editable dwg format file. Checked: 19.05.2025

The extraction of drainage pumping project 3 67m

67 m3 drain pump removing the project - armed concrete - plants - sections - details. It is a fully editable dwg format file. Checked: 19.05.2025

3 concrete tank 20m for the project - plants - sections - details

Project 3 concrete tank 20m - Planet - episode - Details. It is a fully editable dwg format file. Checked: 19.05.2025

The drain pump 180 M3

Drain the pump over 180m 3 armed concrete - plant - details - sections. It is a fully editable dwg format file. Checked: 19.05.2025

50 M3 tank wall

Wall 50 M3 tank - Plant details. It is a fully editable dwg format file. Checked: 19.05.2025

Lift Detail

Detail the lift - section - plant - details. It is a fully editable dwg format file. Checked: 19.05.2025

Machines Room

-Part - plumbing water Domiciliary connection Pb - other plant details. It is a fully editable dwg format file. Checked: 19.05.2025

Trap 3d

For trap 3D tool. It is a fully editable dwg format file. Checked: 19.05.2025

Valve

Ball valve 3D. It is a fully editable dwg format file. Checked: 19.05.2025

5 elevator

Calculate the lift standard with the board. It is a fully editable dwg format file. Checked: 19.05.2025

5 elevator

Calculate the lift standard with the board. It is a fully editable dwg format file. Checked: 19.05.2025

prev < . > next